Your location: Home > Ф 2.2 by 8 meters of second-hand ball mill
Products

Product Name:Ф 2.2 by 8 meters of second-hand ball mill

Ф 2.2 by 8 meters of second-hand ball mill
  • Ф 2.2 by 8 meters of second-hand ball mill
Product Description

Ф 2.2 by 8 meters of second-hand ball mill 
Ball mill - development issues 
Ball mill is pretty expensive configuration: as the ball mill cylinder speed and low (15 ~ 25 RPM), such as using ordinary motor drive, is expensive deceleration device. 
Production costs are high: grinding body at the same time of impact and grinding materials, by grinding strip itself, the cylinder body parts such as lining board also be ground off, so in the cement production process, crushing assignments (raw meal preparation, cement grinding) consumed by the amount of iron is a lot of, according to the analysis, about every tons of cement production of steel consumption is about 1 kg. 
Low working efficiency, such as: in the process of production of cement, electricity is used for crushing operations account for about two-thirds of all, according to statistics, every tons of cement production the power consumption of not less than 70 kilowatt hours, but this part of the electrical energy effective utilization rate is very low, according to the analysis, the input power is used for crushing materials of cement ball mill (doing useful work) accounts for only a small part of the power consumption of about 5% ~ 5%, and most of the power consumption in other aspects, mainly is transformed into heat and sound energy and disappear, this is a big waste. 
Hulking: large total weight of the ball mill can be as big a few hundred tons, such one-time investment must be big. 
The ball mill product parameters 

規(guī)格型號 筒體轉(zhuǎn)速(r/min) 裝球量(t) 進料粒度(mm) 出料粒度(mm) 產(chǎn)量 電機功率(kw) 重量(t)
(t/h)
Ф900×1800 36~38 1.5 ≤20 0.075-0.89 0.65-2 18.5 4.6
Ф900×3000 36 2.7 ≤20 0.075-0.89 1.1-3.5 22 5.6
Ф1200×2400 36 3 ≤25 0.075-0.6 1.5-4.8 30 12
Ф1200×3000 36 3.5 ≤25 0.074-0.4 1.6-5 37 12.8
Ф1200×4500 32.4 5 ≤25 0.074-0.4 1.6-5.8 55 13.8
Ф1500×3000 29.7 7.5 ≤25 0.074-0.4 2-5 75 15.6
Ф1500×4500 27 11 ≤25 0.074-0.4 3-6 110 21
Ф1500×5700 28 12 ≤25 0.074-0.4 3.5-6 130 24.7
Ф1830×3000 25.4 11 ≤25 0.074-0.4 4-10 130 28
Ф1830×4500 25.4 15 ≤25 0.074-0.4 4.5-12 155 32
Ф1830×6400 24.1 21 ≤25 0.074-0.4 6.5-15 210 34
Ф1830×7000 24.1 23 ≤25 0.074-0.4 7.5-17 245 36
Ф2100×3000 23.7 15 ≤25 0.074-0.4 6.5-36 155 34
Ф2100×4500 23.7 24 ≤25 0.074-0.4 8-43 245 42
Ф2100×7000 23.7 26 ≤25 0.074-0.4 8-48 280 50
Ф2200×4500 21.5 27 ≤25 0.074-0.4 9-45 280 48.5
Ф2200×6500 21.7 35 ≤25 0.074-0.4 14-26 380 52.8
Ф2200×7000 21.7 35 ≤25 0.074-0.4 15-28 380 54
Ф2200×7500 21.7 35 ≤25 0.074-0.4 15-30 380 56
Ф2400×3000 21 23 ≤25 0.074-0.4 7-50 245 54
Ф2400×4500 21 30 ≤25 0.074-0.4 8.5-60 320 65
Ф2700×4000 20.7 40 ≤25 0.074-0.4 12-80 400 94
Ф2700×4500 20.7 48 ≤25 0.074-0.4 12-90 430 102
Ф3200×4500 18 65 ≤25 0.074-0.4 按工藝條件定 800 137