Hello, welcome to visit Shandong Linyi Kuntai Machinery Equipment Co., Ltd official website!
13583992199 13562968979
Shandong Linyi Kuntai Machinery Equipment Co., Ltd
HOT KEY WORDS:used ball mill,used crusher,NE elevator,old ball mill
Loading......
Your location: Home > Ф 3 x7 meters of second-hand ball mill
Products

Product Name:Ф 3 x7 meters of second-hand ball mill

Ф 3 x7 meters of second-hand ball mill
  • Ф 3 x7 meters of second-hand ball mill
Product Description

Ф 3 x7 meters of second-hand ball mill 
Ball mill operation procedures 
1, check the good mechanical and electrical parts before driving, check whether the connecting bolt looseness; All lubricating points lubrication is normal, reliable transmission device is normal, protective equipment in good condition, electrical instrumentation is sensitive and good motor carbon brush contact. 
2, barring a week, check equipment around the rotating part or presence of obstacles, and eliminate. Don't stand people around when it is started. 
3, after check, press start button to start the motor, pay attention to the current changes. Grinding ball mill continuous starting must not exceed twice, the first and second every 5 minutes or more, if the third start, must cooperate after checking with electrician, fitter, before starting. Not with other equipment, to crisscross starting, so as to avoid tripping. 
After 4, grinding ball machine normal operation, we will strictly according to the water supply, feed, add the provisions of the steel ball over load operation of ban, idle time is not more than 15 minutes, so as to avoid breaking plate. 
5, should pay attention to check whether the cylinder is in the operation of the slurry, carefully observe current, voltage, feeding, water supply is normal, once every half an hour to check the motor and spindle temperature is not more than 60 ° С, handle in time when problems found. 
6, in the operation should pay attention to observe whether the hollow shaft, oil ring rotation with oil, hollow shaft is normal temperature, such as fever, found that the hollow shaft near the tile burning, immediately forced cooling measures, must not stop immediately, lest cause "axis". At the same time pay attention to examine the oil amount, temperature, lubrication part regularly. 
7, ball mill should be stop feeding before parking, standby in concentration after the treatment, stop water supply. Stop button, pull the switch. 

規(guī)格型號 筒體轉(zhuǎn)速(r/min) 裝球量(t) 進(jìn)料粒度(mm) 出料粒度(mm) 產(chǎn)量 電機(jī)功率(kw) 重量(t)
(t/h)
Ф900×1800 36~38 1.5 ≤20 0.075-0.89 0.65-2 18.5 4.6
Ф900×3000 36 2.7 ≤20 0.075-0.89 1.1-3.5 22 5.6
Ф1200×2400 36 3 ≤25 0.075-0.6 1.5-4.8 30 12
Ф1200×3000 36 3.5 ≤25 0.074-0.4 1.6-5 37 12.8
Ф1200×4500 32.4 5 ≤25 0.074-0.4 1.6-5.8 55 13.8
Ф1500×3000 29.7 7.5 ≤25 0.074-0.4 2-5 75 15.6
Ф1500×4500 27 11 ≤25 0.074-0.4 3-6 110 21
Ф1500×5700 28 12 ≤25 0.074-0.4 3.5-6 130 24.7
Ф1830×3000 25.4 11 ≤25 0.074-0.4 4-10 130 28
Ф1830×4500 25.4 15 ≤25 0.074-0.4 4.5-12 155 32
Ф1830×6400 24.1 21 ≤25 0.074-0.4 6.5-15 210 34
Ф1830×7000 24.1 23 ≤25 0.074-0.4 7.5-17 245 36
Ф2100×3000 23.7 15 ≤25 0.074-0.4 6.5-36 155 34
Ф2100×4500 23.7 24 ≤25 0.074-0.4 8-43 245 42
Ф2100×7000 23.7 26 ≤25 0.074-0.4 8-48 280 50
Ф2200×4500 21.5 27 ≤25 0.074-0.4 9-45 280 48.5
Ф2200×6500 21.7 35 ≤25 0.074-0.4 14-26 380 52.8
Ф2200×7000 21.7 35 ≤25 0.074-0.4 15-28 380 54
Ф2200×7500 21.7 35 ≤25 0.074-0.4 15-30 380 56
Ф2400×3000 21 23 ≤25 0.074-0.4 7-50 245 54
Ф2400×4500 21 30 ≤25 0.074-0.4 8.5-60 320 65
Ф2700×4000 20.7 40 ≤25 0.074-0.4 12-80 400 94
Ф2700×4500 20.7 48 ≤25 0.074-0.4 12-90 430 102
Ф3200×4500 18 65 ≤25 0.074-0.4 按工藝條件定 800 137

More information about second-hand ball mill, please go to http://llsag.com at any time